297 million ounces of refined silver which were estimated to be available for sale in the June 2014 Feasibility Study for the Brucejack Project. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. Procon’s Brucejack Project is a full-service development and production contract delivering 3,800 tpd of ore in Northern BC, Canada. In its announcement, Newcrest said it expected “synergy benefits” of $15 million to $20 million per year from the acquisition and called Brucejack “one of the highest-grade operating gold. The feasibility study for the Brucejack Project is expected to be completed in the second quarter of 2013. Pretium Resources Inc. The mine produced an estimated 319 Thousand. Newcrest will look to build on the strong foundations. ). in four years. Pretium Resources’ Brucejack mine, in B. Pretivm Value Through Gold I TSX/NYSE : PVG BRUCEJACK PROJECT- P(PRESSIONS APPLICATION SUCCESSFUL Thank you for applying. Brucejack gold-silver mine is located about 940 km north of Vancouver, B. The Brucejack mine was previously owned by Vancouver-based mining company, Pretium Resources Inc. The Todd Creek property adjoins the southern boundary of the claim block covering the Brucejack Property, which is owned by Pretivm Resources Inc. • On September 1, 2015, we announced that we had been issued all of the major regulatory permits required to begin development work towards commercial production at the Brucejack Project. 8 millionEnd of quarter cash balance: $40. The Brucejack mine is expected to produce 504,000 toz gold per year, at an AISC of $445/toz, over the first 8 years of production. 4. Innovation [MEMLI]). 0 grams of gold per tonne. is pleased to announce that it has been issued an Environmental Assessment Certificate for its Brucejack Project by the British Columbia Minister of the Environment and. The total project capital cost forecast (the “February 2017 Forecast”) to complete construction of the Brucejack Mine, including contingencies, is US$811. Newcrest announced its Forging an even stronger Newcrest plan in February 2021. disclosure of scientific and technical information concerning a mineral project on a property material to Newcrest comply with NI 43. Our contribution to Brucejack’s endeavor was the detailed design and issued for construction (IFC) drawings for the 57-kilometre transmission line segment north of. 71 m/s (140 FPM) Lift:Seabridge Gold is a Canadian company that is pursuing the development of the Kerr Sulphurets Mitchell ("KSM") gold-silver-molybdenum-copper mine in northwest British Columbia. The Ministers issued the certificate with conditions that have given them the confidence to conclude that the Brucejack Project will be constructed, operated andPretivm is a low-cost intermediate gold producer with the high-grade underground Brucejack Mine in northern British Columbia . A feasibility study completed in June 2014 has outlined Proven and Probable mineral reserves in Brucejack’s Valley of the Kings comprising 6. This project is in the development phase of it’s life cycle, with published reserves and resources along with ongoing exploration and mine construction. Porcupine Mine. program in the Brucejack Project’s Valley of the Kings underway in the 1320 drill bay and the 1310 drill bay. The access road is expected to be completed in late 2012. 48 million lb. Pretium Resources Inc. A pervasive quartz-pyrite-sericite alteration event predates the main stage of epithermal mineralisation. Snowfield deposit, and now a Feasibility Study at its smaller and nearby Brucejack project. Procon Canada East. Geo. Big projects require big equipment, and All-West Crane & Rigging, Ltd. A. Brucejack began commercial production in July 2017 and is one of the highest-grade operating gold mines in the world. , Vice. 57/lb, Ag US$24/oz. The Brucejack mine has had three work-related fatalities since its opening in 2017. down temperature) Page 87 and 88: more heavily altered than those abo. VANCOUVER, British Columbia, May 03, 2021 (GLOBE NEWSWIRE) -- Pretium Resources Inc. (TSX,ASX:NCM),. The Brucejack high-grade project is planned to commence as an underground mining operation, with small-scale open pit mining commencing near the depletion of the underground mining inventory. New High-Grade Gold Exploration Discovery at the Golden Marmot Zone Affirms the District-Scale Potential of Brucejack with 72. Kerr-Sulphurets-Mitchell ( KSM) is an active mine exploration project 65 km northwest of Stewart, British Columbia (1,545 km northwest of Vancouver, British Columbia ). The Brucejack high-grade project is planned to commence as an underground mining operation, with small-scale open pit mining commencing near the depletion of the underground mining inventory. Brucejack Project. Eng. Newcrest intends to work across its value chain to reduce its Scope 3 emissions. The Brucejack high-grade project is planned to be mined as an underground operation with the Valley of the Kings and West Zone the two targeted lodes. With the transitions in Pretivm’sPretivm is advancing its 100%-owned Brucejack Project in northern British Columbia to production as a high-grade gold underground mine. 07 million oz = 4. We welcome Jeane Hull to the Board and Richard O’Brien to the role of Board Chair as Pretivm enters the next chapter as a successful company. L ocated at the top of the Knipple Glacier on the south shore of Brucejack Lake in northwestern British. gold = $652. , Vice. The approach to the Brucejack project includes a 12-km traverse of the Knipple glacier. A feasibility study for a high-grade underground mine in Brucejack's Valley of the Kings is underway and expected in the second quarter of 2013. (SEDAR filings: Pretium Resources Inc. is pleased to announce the initial results from surface drilling in the Valley of the Kings and provide updates for the Brucejack Project. Brucejack is an underground gold and silver mine. and discussion of future plans, projects. Brucejack mine. 3 Memorandum entitled, “Brucejack Project MA/EMA Permitting Phase Responses – to Information Requests from MEM & MOE – Groundwater Quality and QuantityPretium Resources Inc. By Lawrence Roulston. is pleased to announce the following update on the activities underway and planned for 2015 to advance its Brucejack Project. C. P2 is advancing its flagship Gabbs gold-copper project in Nevada with a modern exploration approach. (SEDAR filings: Pretium Resources Inc. Brucejack. 2 Cautionary Statement Forward-Looking Information. The high-grade gold Brucejack Project, a proposed underground mine located in northwestern British Columbia, Canada is in the process of being evaluated and developed. 1. This project is in the development phase of it’s life cycle, with published reserves and resources along with ongoing exploration and mine construction. 130,000 tonnes per day over a mine life of 52 years. 1 of 5 A worker conducts core sample processing at Pretium Resources Inc. 1 3-D geophysical model schematic according to Quantec Geoscience the Brucejack Mine production rate and gold recovery rate; capital modifications and upgrades, underground development and an ticipated benefits thereof, and estimated expenditures and timelines in connection therewith, including with respect to achievem entof steady state production of, 3,800 tonnes A world away from Egypt: The Brucejack camp serving Pretium’s Valley of the Kings. 2 million ounces of gold (15. 0 grams of gold per tonne. (TSX:SEA) and a co-operation agreement with. Newcrest will look to build on the strong foundations established by Pretivm to optimise and further unlock the value of Brucejack. A pervasive quartz-pyrite-sericite alteration event predates the main stage of epithermal mineralisation. An amended feasibility study for Brucejack, based on a new mineral resource estimate for Brucejack's high-grade Valley of the Kings zone, released Dec. Brucejack is its flagship project, although it also has a gold property – Snowfield – near the massive KSM mine proposed by Seabridge Gold Inc. Masse adds that Pretium also received a smaller. , for Pretium Resources. Share this article. (SEDAR filings: Pretium Resources IncThe project hosts another 1. The Brucejack project is one of the largest, high-grade gold projects in the world. The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. 5 g/t Gold Over 53. The mine will operate until 2035. Hazelton-based Tsetsaut Ventures Ltd. . 4. Sc. Brucejack hosts a major undeveloped high-grade gold resource, with Probable. The company. The Brucejack Project is subject to a 1. Brucejack Mine – Cash Generating Since Start-Up December 3, 2019 Scotia Bank Mining Conference 2019. In March 2016, the foundation of the camp was poured and the mill pad levelled. Early Jurassic sedimentary and volcanic rocks of the Lower Hazelton Group host mineralisation. Robert Quartermain, now co-chairman of Dakota Gold (NYSE American: DC), recalled in another session how Orion showed flexibility and trust in his plan to develop the Brucejack project in British. 6 (con’t)Brucejack Prope. Geo. In November 2012, Pretium retained Snowden Mining Industry Consultants to review the initial results of Pretium’s mineral exploration program and to conduct a mineral resource estimate for the. Sc. (Pretivm) proposes to develop the Brucejack Gold Mine Project (the Project) as a 2,700 tonne per day (tpd) underground gold/silver mine over a minimum 16-year mine life. 9 million ounces of. , P. Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable. 07, 2021 (GLOBE NEWSWIRE) -- Pretium Resources Inc. 3 . 1 of 5 A worker conducts core sample processing at Pretium Resources Inc. 1. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. The camp and processing facility at Newcrest's Brucejack gold mine in the Golden Triangle region of Northern BC. gold = $652. The combined bulk tonnage resource at Brucejack and. 1 of 4 The president and chief executive officer of Pretium Resources Inc. 5 Meters, including 6,700 g/t Gold Over 0. Konkin was appointed the Project Manager for Pretium Resources after it purchased the Snowfields-Brucejack. Final 20 November 2012 7 of 106 Figure 8. 17 million measured and indicated tonnes grading 223 grams silver per tonne, 8. Page 85 and 86: more distal (i. The software allows you to modify information, eSign, annotate, and share files. The Brucejack high-grade project is planned to be mined as an underground operation with the Valley of the Kings and West Zone the two targeted lodes. 5 kilometers northwest of Brucejack, and the. 824. com Location British Columbia, Canada Mine Type Underground Metals Gold & silver Date of First Production July 2017 Brucejack: Solidifies Leadership Position in Canada with Five Operating Mines and Development Projects Brucejack delivers strong safety, environmental and sustainability outcomes. The 2021 Brucejack definition and expansion drill program is anticipated to total approximately 195,000 meters of drilling comprised of in-reserve definition drilling (40%), in-resource and. 1. Subsequently, he was instrumental in the discovery of the Valley of the Kings deposit at the Brucejack Mine, an 8 million ounce gold deposit that is currently in production. We welcome Jeane Hull to the Board and Richard O’Brien to the role of Board Chair as Pretivm enters the next chapter as a successful company. (TSX/NYSE: PVG) (“Pretivm” or the “Company”) today. 5 million. Gabbs has an Inferred Mineral Resource of 1. (TSX/NYSE: PVG) (“Pretivm” or the “Company”) today announced that it is currently managing 9 cases of. 5 Meters, including 6,700 g/t Gold Over 0. Pretium Resources (PVG) is a mining exploration company with assets in British Columbia, Canada. Capital expenditures to the end of Q3 2015 for the development of the Brucejack Project have totaled US$66 million. A pervasive quartz-pyrite-sericite alteration event predates the main stage of epithermal mineralisation. x 7. The company was founded in 1979 as a mining. Pretium Resources Inc. Vancouver, British Columbia (June 2, 2011; TSX:PVG) - Pretium Resources Inc. 95 million from the CleanBC Industry Fund in 2021 to help fund part of the project. (Pretivm) proposes to develop the Brucejack Gold Mine Project (the Project) as a 2,700 tonne per day (tpd) underground gold/silver mine over a minimum 16-year mine life. is pleased to announce that it has received an Environmental Assessment Decision Statement from the Federal Minister of the Environment which finds that the Brucejack. Pretivm is advancing its 100%owned Brucejack Project in northern British Columbia to - production as a high -grade gold underground mine. ; Pretivm Resources Inc. . 15/lb, Ag US$20/oz. It is an. GDMM15845MP-MPThe 2019 Report updates the operating parameters contemplated in the Brucejack Feasibility Study entitled “Feasibility Study and Technical Report Update on the Brucejack Project, Stewart, BC. 8 thousand ounces, respectively, in 2021. ). British Columbia's Golden Triangle is host to some of the world's largest gold deposits. The Life Sciences Report. C. BRITISH COLUMBIA – Vancouver’s Pretium Resources is a year away from production at its Brucejack underground gold mine north of Stewart, but the company says the project is on budget – an all-in capital budget of US$640. The Brucejack project is located in an area that drains into the Unuk River, important for salmon production, and which eventually flows into Tongass National Forest in Alaska. is pleased to report on the progress of site construction activities at its high-grade gold Brucejack Project located in northwestern British Columbia. Read More With over 200 projects completed. Estimated capital cost to develop the Brucejack project has increased by 12. Section 1. The Brucejack project is located in an area in northwestern BC known as the Golden Triangle, which contains more than 935 mineral occurrences, including ten potential new mines (such as Brucejack. given the features of the Brucejack Project. The proposed Project would produce approximately 16 million tonnes of mineralized material at a rate of up to 2,700 tonnes per day over aVANCOUVER, British Columbia, Feb. VANCOUVER, British Columbia, CANADA"The sale of Snowfield and Brucejack is the culmination of an extensive review of strategic alternatives focused on developing projects that are core to capability and strategy whilst monetizing project options that are best developed by others," said John Smith, Silver Standard's Chief Executive Officer. 57:1 (Snowfield deposit) and 2. com Recommends. Pretivm is advancing the high-grade, underground gold opportunity at Brucejack and the open pit opportunities at both Brucejack and Snowfield. VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 7, 2011) - Pretium Resources Inc. Page 81 and 82: Figure 7. The Project’s projected production and processing is summarized in Table 4 below. 95 million from the CleanBC Industry Fund in 2021 to help fund part of the project. The Project includes the past-producing Scottie Gold Mine that operated from 1981 to 1985, and produced 95,426 oz gold at an average grade of 16. Brucejack Gold Mine is a high-grade underground mining operation using the long-hole stoping mining method (both transverse and longitudinal) and cemented paste backfill. Brucejack Transmission Line Energized . is pleased to report on the progress of site construction activities at its high-grade gold Brucejack Project located in northwestern British Columbia. Permitting of a high-grade underground gold mine at Brucejack is underway. Ian I Chang, M. 50/lb, Zn US$1. Brucejack Mine site, March 2016 — Photo courtesy Pretivm Resources Inc. With the US$540 million construction financing package announced in September. The Technical Report for the Brucejack Project Feasibility Study is expected to be filed on SEDAR within 45 days and will also be available at Ian I Chang, M. Stephanie Wafforn, P. Page 85 and 86: more distal (i. Brucejack Mine Capit al Cost Forecast . The Brucejack high-grade project is planned to be mined as an underground operation with the Valley of the Kings and West Zone the two targeted lodes. 6. • Manage water diversions, operate and maintain water pumps, plan and monitor work on sumps, ditches, erosion control, and culvert installations. The Brucejack Project, or Brucejack Mine, is a mine located in northwestern British Columbia and is comprised of 4 mining leases and 6 mineral claims currently totaling 3,304 hectares in area. Pretivm is advancing its 100%-owned Brucejack Project in northern British Columbia to production as a high-grade gold underground mine. timing of development of Pretivm's Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost. A. 1 Metal prices: Cu US$4. Construction and. (TSX/NYSE: PVG) (“Pretivm” or the “Company”) today announces that underground exploration drilling. Cementation’s development scope of work involved 12,000 m of ramp and lateral development, 1000 m of raising, and crusher/bin excavation. Job seekers interested in opportunities at Brucejack, Red Chris, Lihir, Cadia or Telfer can use the search feature below. The winter conditions, while challenging, did not slow Pretivm’s construction pace. The Brucejack Project is located in the Stikine terrane of north-western British Columbia, 50 km north of the town of Stewart. advance the Brucejack project, and, as so many know, he was a tireless supporter over the years as we evolved an exciting exploration project into a profitable mine. silver, 222. P2 is advancing its flagship Gabbs gold-copper project in Nevada with a modern exploration approach. Brucejack Project - Market Research Reports & Consulting. VANCOUVER, British Columbia, May 03, 2021 (GLOBE NEWSWIRE) -- Pretium Resources Inc. Gold production at the Cadia project reduced from 169 262 oz to 133 468 oz, with the project also contributing 22 392 t of copper production. y the Brucejack Fault as well as by. You may view your papers from anywhere with an internet connection. The Brucejack Project is northwest British Columbia. BRUCEJACK GOLD MINE PROJECT TSETSAUT/SKII KM LAX HA NATION TRADITIONAL KNOWLEDGE AND TRADITIONAL USE REPORT June 2014 Project #0194150-0020-0090 Citation: ERM Rescan. 9 lb. In 2010 a total of 33,400 metres of diamond drilling was completed in 75 holes. ” The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. The Brucejack Project, located in northwestern British Co-lumbia (BC), is a 2,800 t/d, high grade, underground, gold mining operation. The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. Pretivm Reports COVID-19 Outbreak at Brucejack, Temporarily Restricts Travel. 95:1 (Brucejack deposits), with a mill feed rate of 120,000 tonnes per day. in more than a. Brucejack is located in northwestern British Columbia, approximately 65 kilometers north of Stewart, and is owned by Pretium Resources Inc. With First Nations consultation well underway, the other prerequisites fell into place. Conveying Rate: 45 t/h (49. . "Nis g a'a Nation strives for sustainable prosperity and self-reliance," stated President H. Surface topography has a pervasive influence on the groundwater flow system at the mountainous, remote site, which is bounded by temperate glaciers. C. On February 3, 2017, we announced that the total project capital cost forecast to complete. New company Pretium, led by Bob Quartermain, former president of Silver Standard Resources, proceeded to develop the Brucejack project, with a PEA completed the same year. Cementation’s development scope of work involved 12,000 m of ramp and lateral development, 1000 m of raising, and crusher/bin excavation. Pretivm is currently looking for Senior Mine Engineers (2) for the Brucejack Project. Pretivm is creating value through gold at its high-grade gold Brucejack Project, located in northern British Columbia. Designers: Bulkley Valley Eng. 2% net smelter returns royalty on production in excess of 503,386 ounces of gold and 17,907,080 ounces of silver. is proposing the construction, operation and decommissioning of a gold-silver underground mine located approximately 65 kilometres north of Stewart, British Columbia. The Gold Report. The Valley of the Kings zone is the “heart of the Brucejack Project. 0001199835-13-000237. Pretium Resources has secured a mine permit for its new $750m Brucejack project in British Columbia, Canada, and has passed all provincial and federal. , P. Eng. Head Office. Based on the results of the June 2014 Feasibility Study. Based on the results of t he June 2014 Feasibility Study, Brucejack is expected to produce an average of 504,000 ounces of goldPretium will use the proceeds as working capital for its 100%-owned Brucejack gold mine project and for general corporate purposes. Construction and. Head Office. Share this article. The Brucejack project is one of the largest, high-grade gold projects in the world. the project capital costs and initial working capital for the Brucejack Mine are expected to be fully funded. Brucejack. 6Brucejack Property Geolog. 92 US$/C$, Brucejack has a pre-tax NPV at a 5% discount of US$3. 2. Services Ltd. • Create and coordinate management systems for all solid waste for the Brucejack Project. Mitchell Stevens, "and the benefits from the Brucejack project will make an important contribution. In order to develop this project the company needs just over $400. Pretivm has 100% interest in the Snowfield and Brucejack Projects; combined they represent one of the largest underdeveloped gold resources in North America. The Gold Report. 6% zinc and 4. 2021 Feasibility Study Highlights. 1 VALUE THROUGH GOLD Q2 2019 Financial & Operating Results Conference Call August 02, 2019 Brucejack Mine Generates $41 Million Cash from OperationsCertain technical information relating to the Brucejack Project contained in this AIF is derived from, and in some instances is an extract from, the report entitled “Technical Report and Updated Preliminary Economic Assessment of the Brucejack Project” (the “ Brucejack PEA ”) dated February 20, 2012, which was prepared byPretium Resources Inc. Page 81 and 82: Figure 7. Konkin was appointed the Project Manager for Pretium Resources after it purchased the Snowfields. MINFILE No 104B 196. The Energy Report. 1 g/mt gold. The Porcupine Mine, owned by Newmont, is a surface and underground mine located in Ontario. , Puritch, E. 3 announcement that the Brucejack project timeline had been accelerated "with dry commissioning now scheduled to commence in March 2017 and. Gold and silver will be produced using gravity and flotation circuits. Based on the results of the June 2014 Feasibility Study. ) Newcrest Mining (ASX, TSX: NCM) is expanding its footprint in Canada, particularly in British Columbia’s Golden Triangle, after. 1. is pleased to report on the progress of site construction activities at its high-grade gold Brucejack Project located in northwestern British Columbia. Full-service underground mine development and production contract for a 3,800 tpd longhole, transverse stoping operation in the Golden Triangle, British Columbia, Canada. Pretium Resources Inc. has sent out 172 layoff notices after negotiations failed with Pretivm to continue contract work at Brucejack Mine, according to Tsetsaut owner Darlene Simpson. Of this, 11 holes comprising 3693 metre were targeted at VOK (Valley of the Kings), and 2 holes, totalling 1119 metres at the footwall of West zone. played a major role in the Brucejack project, providing cranes and staff to help in the construction of mine facilities. Zijin Mining Group of China recently bought into the project , though further financing is needed. ’s Golden Triangle, achieved commercial production in July – only eight years after the super high grade Valley of the Kings deposit at the project was discovered. and the Nisga'a Nation are pleased to announce that they have entered into a comprehensive Cooperation and Benefits Agreement in respect of Pretivm's Brucejack Project. — Photo courtesy Pretium Resources Oskar Lewnowski, Chief Investment Officer of the Orion Mine Finance Group, commented, "As one of the largest investors dedicated to the mining industry, we are delighted to provide a portion of this comprehensive funding solution to the. is pleased to report the following highlights from the fourth quarter of 2016 and updates for its high-grade gold Brucejack mine in northern British Columbia. 's Brucejack project await to be processed. com. e. This program identified 65 targets on the Brucejack Property, with Golden Marmot ranking as a high priority drill target for quartz vein hosted gold. Based on the Preliminary Assessment, the Snowfield-Brucejack Project would be operated as an open pit mine with an estimated 27 year mine life and life-of-mine waste to mineral material stripping ratios averaging 0. 2020 Brucejack Mine Total Proven and Probable Mineral Reserve Estimate. 54 billion (US$2. Page 79 and 80: Previously, some of the rocks strad. Cost: $268,175 Location: Brucejack Lake, Knipple Glacier, BC, Canada Year: 2012-12-01 Size: 12,500 gpd Owner: Pretium Resources Inc. A pervasive quartz-pyrite-sericite alteration event predates the main stage of epithermal mineralisation. Over 700 employees and contractors were working to complete the project. And it shows that even in a downturn a project. Pretivm's management will present an update of the activities planned and underway to advance the Brucejack Project today, June 9, 2015, at 12:00 pm ET/9:00 am PT with a live audio webcast. The Brucejack project is about 65 kilometers north of the town of Stewart in Northwestern British Columbia, Canada. “Brucejack is the only gold mine under construction in B. (“Pretivm”) is pleased to report positive results from a National Instrument 43-101-compliant Preliminary Economic Assessment (“PEA”) for the high-grade gold and silver resources identified to date at its Brucejack Project in northern British Columbia. played a major role in the Brucejack project, providing cranes and staff to help in the construction of mine facilities. 28 ha in area and all claims are in good standing until January 31, 2017. C. Complete form brucejack project - and other documents on your Android device with the pdfFiller app. Its flagship project is the Brucejack project, which consists of four mining leases and six mineral claims, covering 3,304 hectares in northwestern British Columbia. Alternative high case economics: At US$1,400/ounce gold, US$21/ounce silver and exchange rate of 0. 8292 E info@procongroup. 57:1 (Snowfield deposit) and 2. 5 million mt of ore at an average mill feed grade of 14. C. Act (MA) Permit #M-243 for the Brucejack Gold Mine Project (Brucejack), which is an underground gold and silver mine, located approximately 65 kilometers northwest of Stewart and within the asserted traditional territory of Tsetsaut/ Skii km Lax Ha (TSKLH). 95:1 (Brucejack deposits), with a mill feed rate of 120,000 tonnes per day. 5 Meters Stephanie Wafforn, P. While prepaid forward agreements run the gamut from smaller transactions that fly under the radar to larger transactions that make the headlines, such as the offtake-linked Pretium Resources Inc. Brucejack Gold Project Brucejack is located in northwestern British Columbia, approximately 65 kilometers north of Stewart, and is owned by Pretium Resources Inc. Pretium also received $7. Sc. The 24 million ounces of gold outlined by drilling at the Treaty Creek project in northwestern British Columbia’s Golden. Pretium And Nisga'a Nation Sign Brucejack Project Cooperation And Benefits Agreement (Update). Brucejack offers significant near mine and district-scale exploration opportunities with exciting potential to realise resource and reserve growth. The Brucejack project is 100% owned by Pretium Resources (TSX:PVG). , Pretium Resources’ Brucejack project promises to add lustre to the province’s mining industry. 6% to $746. The Galena Hill area is underlain by rock of the Lower Jurassic Unuk River Formation, Hazelton Group. 2 . 7 million tonnes grading 8. Owner Pretium has taken steps to minimize tailings risks by backfilling about half its mine waste in a paste mixed with cement in the underground mine. In 2010 a total of 33,400 metres of diamond drilling was completed in 75 holes. The Company's Brucejack Project is located on the Brucejack Property, which consists of four mining leases and six mineral claims approximately 3,306 hectares. Pretivm is the owner of the Brucejack operation in the highly prospective Golden Triangle region of British Columbia, Canada. 2 of the CPD identifies the Brucejack Access Road as a Project component and Figures 1-1, 1-2a and 1-2b identify related spatial boundaries. Brucejack began commercial production in July 2017 and is one of the highest-grade operating gold mines in the world. Based on the results of the June 2014 Feasibility Study. If the Brucejack project has a AISC of $448. Brucejack gold-silver mine is located about 940 km north of Vancouver, B. in accordance with National Instrument 43101 - for its Brucejack Project, where construction and development continues on schedule for commissioning of the underground mine in mid-2017. Pretium Resources has secured a mine permit for its new $750m Brucejack project in British Columbia, Canada, and has passed all provincial and federal environmental agency approvals. . The Brucejack Project is located in the Stikine terrane of north-western British Columbia, 50 km north of the town of Stewart. Chris Gareau. Brucejack’s Valley of the Kings deposit, with an increase in Proven and Probable Mineral. The Brucejack Project is located in the Stikine terrane of north-western British Columbia, 50 km north of the town of Stewart. The Brucejack mine was previously owned by Vancouver-based mining company, Pretium Resources Inc. reports the following update for the Valley of the Kings Bulk Sample Program at its Brucejack Project, for which processing is now underway. ”. 6. , Vice President, Project Development, Pretium Resources Inc. Pretium owns the Brucejack project, a high-grade underground gold mine complex in British Columbia, Canada. C. Mr. in 2004 as chief geologist. About Pretivm . Third Party Review Completed. The 57-kilometer long transmission line connecting the Brucejack Mine to the BC Hydro power grid was completed on March 21, 2017 and energized on March 31, 2017 following regulatory approval. (SEDAR filings: Pretium Resources Incprogram in the Brucejack Project’s Valley of the Kings underway in the 1320 drill bay and the 1310 drill bay. In 2010 a total of 33,400 metres of diamond drilling was completed in 75 holes. The main focus of the Brucejack project is the Valley of the Kings' site. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine. Brucejack is uphill from the Kerr-Sulphurets-Mitchell project, a lower-grade, multi-metal mine owned by Toronto-Based Seabridge Gold . Brazil Potash’s Autazes project halted on permitting suspension. is pleased to report the final set of drill results from the 2015 regional grass-roots exploration program conducted on the property surrounding the Brucejack Project. A. The project will expand in phases, with the expansions focused on processing, starting at six. , until Newcrest acquired the company and the mine in March of this year. These three main projects will be a great. Table 4: Brucejack Project Total Mine Projected Production and Processing Summary(5) Year Tonnage (t) Gold grade Procon has worked on the Brucejack Project since 2012 when it was solely a helicopter-supported site. The Brucejack project spans 1,200 square kilometres in the heart of British Columbia’s Golden Triangle, which has a 100-year mining history and also hosts the Red Chris, Eskay Creek and Snip. 620-4445 Lougheed Highway Burnaby, BC, Canada, V5C 0E4 T 604. has been shut down, following a fatality there. , Brown, F. Pretium Resources Inc. a new zone 13 kilometers southeast of the Project. The Brucejack Project is located in British Columbia. A pervasive quartz-pyrite-sericite alteration event predates the main stage of epithermal mineralisation. The life of mine stands currently at around 18-years. The Brucejack mine was previously owned by Vancouver-based mining company, Pretium Resources Inc. Also their site shows 30 million oz silver not to mention all. This past Monday, Silver Standard announced the results of a preliminary economic assessment combining its Snowfield and Brucejack projects. 28 billion post. Brucejack hosts a major undeveloped high-grade gold resource, with Probable. With the transitions in Pretivm’sExploration expenditures at the Snowfield and Brucejack Projects during 2010 totaled approximately $21. 07 million oz = 4. The Scottie Gold Mine Project is located 32 km north of Stewart, BC, and is situated 20 km north the Premier Gold Mine, 27 km south of Brucejack Mine, and 15 km east of the past-producing Granduc Mine. Pretium Resources has secured all the major regulatory permits that are needed to begin development at its 100%-owned Brucejack Gold project in northern British Columbia, Canada. It is located approximately 950 kilometres northwest of Vancouver, 65 kilometres north-northwest of Stewart, and 21 kilometres south-southeast of the Eskay Creek Mine.