Resident Inspector (Mail Drop 927N, 2 Copies) INPO Records Center -Atlanta, GA. Office of Nuclear Reactor Regulation . gov 301-415-4083 301-415-5342 Summary: This revision reflects the reunification of NRR and NRO and makes other. Reactor. Veil joined the NRC in 1992 as an intern and has held a wide range of key management and leadership positions, including Deputy Office Director, Office of Nuclear Regulatory Research; and NRR Deputy Office Director for Engineering. The Office of Nuclear Reactor Regulation (NRR) is responsible for accomplishing key components of the NRC's nuclear reactor safety mission. tlw4@nrc. 1. gov Anthony J. remainder on Oct. S. Singh, NRR Madden, NRR E. 3, and the audit report template in. S. Robert M. 50-297 Enclosures: 1. Karwoski K. The objective of this office instruction is to define the process for. Break: 10:45 a. Oliver D. Commission (NRC) Petition Review Board (PRB) regarding a 10 CFR 2. PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) NRC/NRR ENTERGY OPERATIONS INC. gov * Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings @ (67 FR 36920), May 28, 2002 Distribution: PUBLIC LPL3-1 R/F RidsNrrPMJCushing RidsNrrAdro RidsNrrDorl RidsOpaMailCenter AHiser, NRR. Division of Operating Reactor Safety. Drake The Office of Nuclear Reactor Regulation (NRR) COVID-19 Coordination Team (NCCT) has completed the initial Lessons Learned Report related to Operating Reactor Licensing activities during the COVID-19 public health emergency response. Mahesh Chawla, Project Manager Plant Licensing Branch . EVR-ACS-GL-001, “Advanced Logic System v2 Platform Licensing Strategy” 3. Purpose of Today’s Meeting • Review NRC staff’s draft white paper, “Risk-Informed andLetter from Michael S. When the NRC issued Revisions 2 and 3 of this RG, 10 CFR 50. gov John Tsao, NRR Thomas Scarbrough, NRR 301-415-2702 301-415-2794 John. Nuclear Regulatory Commission (NRC) staff requesting that the agency withhold the following information from public disclosure pursuant to Title 10 of the Code of Federal Regulations. A. Location: NRC One White Flint North, OWFN-7-B4 11555 Rockville Pike Rockville, MD Category: This is an Observation Meeting. Background Q. My name is Anneliese Simmons (AS). NRC Document Control Desk . Office of Nuclear Reactor Regulation August 25, 1995 FROM: SUBJECT:. of established NRC policies; and (3) significant restructuring of technical specifications, changes that introduce significantly different analytical methodologies, and changes that are related to revising established NRC policies. NRC/NRR and NEI 2:00 –2:15 pm Status of Non-Light Water Reactor PRA Acceptability Regulatory Guide NRC/NRR 2:15 –2:45 pm Draft White Paper on Inservice Inspection/Inservice Testing Guidance NRC/NRR and INL 2:45 –3:15 p. gov Responsible Organization: NRR/PMAS Summary of Changes: Initially issued January 15, 2003, this. Lain : A. Office of Nuclear Reactor Regulation U. A company with a NRR of 130% and a GRR of 60% would still be looked as less favorably, as revenue would be less predictable and would be very contingent on ability to effectively upsell existing customers. Do you want to know how the US Nuclear Regulatory Commission (NRC) is structured and who is in charge of what? Check out this PDF document that shows the NRC organization chart, with the names and titles of the key leaders and staff in each office and region. NRC Feedback Regarding 4. resource@nrc. Effective March 28, 1999, the NRC reorganized the Office of Nuclear Reactor Regulation (NRR). NRR Deputy Office Director for New Reactors Robert Taylor. : LIC-500, Revision 4 Office Instruction Title:. Office NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1/PM Name GEMiller KGoldstein MMarkley GEMiller Date 11/21/2023. hughey@nrc. (NRC internal guidance on the initial acceptance review process for LARs) If a proposed activity requires prior NRC approval of a change to the OL, the licensee must Office of Nuclear Reactor Regulation (effective October 13, 2019) NRR Deputy Office Director for Engineering Mirela Gavrilas. S. Chaired by the Office Director, Office of Nuclear Reactor Regulation (NRR), the NRC RISC [email protected] U. and Westinghouse submitted presentation slides to the NRC (ML23271A159). The purpose of 10 CFR Part 51, “Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions,” is to ensure that Staff from the Office of Nuclear Reactor Regulation (NRR) issues a request for additional information (RAI), when necessary, to support reasonable assurance findings on the safety of a design, operation, or siting, as well as environmental issues, in accordance with the Nuclear Regulatory Commission (NRC) rules and regulations. The following list of industry priorities for new and advanced reactors is a snap shot in time and is expected to evolve. The NRC intends to publish the notice of intended operation 210 days before scheduled fuel load, although the NRC may publish this notice up to 75 days earlier than that if the uncompleted ITAAC notifications are submitted earlier than required and certain other prerequisites are satisfied. The list of attendees is enclosed. In 2002, he was selected as a Technical. S. You can use historical NRR in financial. The Office of Nuclear Reactor Regulation, is a subordinate part of the United States Nuclear Regulatory Commission. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Regulatory Guide (DG), DG-1415, ``Dedication of Commercial-Grade. 12) (NRC internal guidance on the license amendment review process) NRR Office Instruction LIC-109 (Ref. 54(f). Schoppman, et al. The attached NRC announcement contains branch level functional statements and an organization chart showing the new NRR structure. gov jfs2@nrc. To assist us in providing a prompt response, please include your license number, docket number, invoice number, if applicable, and a daytime number (including the area code) where you can be reached. Nuclear Regulatory Commission (NRC) is issuing Revision 2 to Regulatory Guide (RG) 1. gov Attachment: List of Recently Issued NRC. Poslusny, NRR S. The general purpose of this office instruction is to provide guidance to staff in the Office of Nuclear Reactor Regulation (NRR) and the staff in other NRC offices supporting NRR for. Michael. Inspection and Regional Support, NRR, at the NRC. NRC GENERAL ELECTRIC A. 50-382 Enclosure: Agenda (ADAMS Accession No. Director: Theresa Clark (Acting) Deputy Director: Michael Hay. Handling Requests to Withhold Proprietary Information from Public Disclosure. Tam, NRR NRC Document Control Desk NRC Resident Inspector U. Harbuck, NRR C. Purple R. gov Stephen Cumblidge, NRR 301-415-2823 e-mail: Stephen. NRC/NRR J. Gran, NRR R. NRR Office Director. ''. The NRC staff asked NuScale if they anticipate submitting any inspection, test, analysis, and acceptance criteria (ITAAC) as part of the LWA, and NuScale. 54(f), and NRC MD 8. gov. Hebdon, NRR L. Commissioner Plenary Introduction and Moderator | Video | Transcript. High Energy Arc Faults . Established by the Energy Reorganization Act of 1974, the Nuclear Regulatory Commission (NRC) is an. (NRC) The Nuclear Regulatory Commission regulates commercial nuclear power plants, and other uses of nuclear materials. (NRC) staff conducted the meeting in accordance with NRC Management Directive 3. Fuel Cycle Safety, Safeguards, and Environmental Reviews. Office of. 1 1 1 1 1 h d d s r i d h ncte k) all "ries" reczpzenis: please help us xo reduce waste! cxnzact 'ihe dxumem1'gÃiboldesk, kom pl-37 (eÃz. H • Vo 11 mer T. The. Estimated exposure (only earmuffs) = 100 dBA – (31 – 7) x 0. Hsueh, NRR M. NRC NEI R. 2 Joseph Ashcraft NRC/NRR/DEX/EICB Grace Kim NRC/OGC Susan Vrahoretis NRC/OGC Anthony Rossi NRC/OCFO/DOB/LFPT David D'Abate NRC/OCFO/DOC Jawanza Gibbs-Nicholson NRC/OCFO/DOC/LAFBB/FBT Derek Widmayer NRC/ACRS Tony Nakanishi NRC/COMM/OCM Robert Krsek. Primary Contacts: Clayton Pittiglio George Wunder 301-415-1435 301-415-1494 [email protected] RIV, WCFO C Poslusny, Jr. ''. NRC . AdditionalIt is the policy of the Office of Nuclear Reactor Regulation (NRR) to provide guidance for its staff to meet the requirements and performance goals established in legislation, regulations, the Agency’s strategic plan, and office-level operating plans. Sprengel R. As part of the regulatory process, the four regional offices conduct inspection, enforcement, and emergency response programs for licensees within their. The NRC is issuing a revision in the NRC's “Regulatory Guide” series. Primary Contact: Name Name 301-415-xxxx name. Switch Board: Toll free: 1-800-368-5642 | Local: 301-415-7000 | TDD: 301-415-5575. Created Date:Ray Furstenau, Director, Office of Nuclear Regulatory Research, NRC; Perspectives from The Honorable Jeff Baran. Dudes, NRR J. m. gov Matt McConnell 301-415-1597 matthew. U. meeting was conducted to explain the use of the Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-504, “Integrated Risk-Informed Decisionmaking. Veil is the first African American and first woman to be appointed as Director of NRR. Based on anticipated interactions with the NRC, and the potential need for additional refinements to NEI 21-07, Rev 0, NEI intends to provide Revision 1 to this document before formally requesting NRC review and endorsement. Brown, et al. Nuclear Regulatory Commission (NRC) is currently engaged in review activities of the Hermes construction permit application. Zimmerman et al. John Segala NRC/NRR/DANU/UARP Cyril Draffin US Nuclear Industry Council Maryam Khan NRC/NRR/DANU/UARP Denis Henneke GE Hitachi Eric Oesterle NRC/NRR/DANU/UARP Steven Nesbit LMNT Consulting Arlon Costa NRC/NRR/DANU/UARP Frank Akstulewicz A to Z Reactor Consulting Services Juan. For example, if you retain 150 customers in a year, but they downgraded to lower plans and spent less than the previous year, your customer retention metric stays the same. Subbaratnam, NRR, NRC NRC Resident Inspector, HBRSEP 9811230069 981116 PDR ADOCK 05000261 S PDR Highway 151 and SC 23 Hartsville SC. Office of Nuclear Reactor Regulation (NRR)[email protected], and Prosanta Chowdhury, Office of Nuclear Reactor Regulation, telephone: 301-415-1647, email: Prosanta. Nuclear Regulatory Commission (NRC) held a Category 2 public meeting with industry stakeholders, including the Nuclear Energy Institute (NEI) and the U. 02 Presumption of Operability 4 06. S. O’Quinn Docket No. Schiffley, Exelon S. Office of Nuclear Reactor Regulation NRR OFFICE INSTRUCTION Change Notice Office Instruction No. 109, 10 CFR 50. Kingsley, Jr. ML21167A353 NRC-106 OFFICE NRR/DRO/IQVB NRR/DRO/IQVB NAME AKeim KKavanagh DATE 7//2021 7/8/2021 OFFICIAL RECORD COPY. If you have questions concerning our input, please contact me at 202-739-8131 or . Reyes, NRC, Region II Mr. Zoulis 301-415-1209. Kalyanam, et. Nuclear Regulatory Commission, Washington, DC 20555– 0001, telephone: 301–415–6256; email:PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). John. S. NRC staff will have additional discussions internally to determine the schedule and path forward for the closure of Bulletin 2012-01. Dean, OEDO J. Fields, NRR (301) 492-1173 E. Generic Communications are available for electronic distribution and can be obtained by subscribing to the list server. Putnam N. Whitman, NRR, et al. Clement, NRR K. NRC Staff Contacts for Advanced Reactor Research Plan, REV 9 Area RES NRRINMSS/NSIR REAHFB Comments Contacts Regulatory Framework Mary. govthe NRC memo, “Transmittal Of Deliverable For Task 1 Under Informal Assistance Request NRR-2021-018, "Verification Of MACCS Dose Conversion To Compute Total Effective Dose Equivalent"” and staff report, “Use of MACCS Dose Coefficient Files to Compute Total Effective Dose Equivalent,” which provides a review of the currentlyThe NRR member on the NRC=s CMT is the Director of NRR, who will provide advice and support concerning NRR PPFs and staff. T2 - New Fuels Licensing Readiness | Video. Nuclear Regulatory Commission, Washington, DC 20555– 0001, telephone: 301–415–6256; email:Greg Galletti, Human Factors Specialist, NRR T. ML003692416)] address the third level of the licensing bases hierarchy. Nuclear Regulatory Commission, Washington, DC 20555–0001. Provides leadership; plans, recommends, manages and implements programs of nuclear regulatory research; and interfaces with all NRC offices and the Commission on research issues. • NRR User Need Request (UNR) NRR-2015-009, “User Need Request for Support in the Enforcement Branch. GRR calculates total revenue (excluding expansion) minus revenue churn (contract expirations, cancelations, or downgrades). Carries out day-to-day supervision, guidance, and direction of the Offices of Nuclear Reactor Regulation, New Reactors, Nuclear Security and Incident Response, and the Agency's four regional offices. ACTION: Draft regulatory issue summary; public meeting and request for comment. Consistent with the NRC's 1999 PRA policy statement, the NRC risk-informed steering committee (RISC) was established in 2014 to provide strategic direction to NRC staff to advance the use of risk-informed decision-making (RIDM) in various NRC activities. gov E-mail: sxk@nrc. Research and test reactors comprise one of four sub-arenas that the staff of the U. : ADM-202, Revision 1. 02 Branch Chief, Technical Specifications Branch (DSS/NRR) 4 0326-06 OPERABILITY DETERMINATION PROCESS 4 06. J. 4 (formerly NRC Manual Chapter 0514). gov Terry Beltz, NRR 301-415-3049 [email protected]@nrc. : LIC-107, Revision 2 Office Instruction Title: Procedures for Handling License Transfers Effective Date: June 5, 2017 Approved By: Michele G. The purpose of 10 CFR Part 51, “Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions,” is to ensure thatOFFICE OF NUCLEAR REACTOR REGULATION LIC-115, Revision 1 Processing Requests for Additional Information Volume 100 Licensing Processes Approved By: Michael I. Uses for HALEU. gov. Vasavada@nrc. 2 dated November 23,. 12) (NRC internal guidance on the license amendment review process) NRR Office Instruction LIC-109 (Ref. Nguyen@nrc. S. Implements the NRC inspection program for all operating reactor facilities in Region IV. gov Alfred. Attachment . NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. Scott Wall, NRR 301-415-2855 scott. U. Nuclear Regulatory Commission’s (NRC’s) Office of Nuclear Reactor Regulation (NRR) to develop office instructions (OIs) for the staff’s review of licensing applications submitted under Title 10 of the Code of Federal Regulations (10 CFR) Parts 50, 51, 52, and 54 that involve two or more NRR divisions or other NRC Brian W. is available on the NRC website. Tam, NRR NRC Document Control Desk NRC Resident Inspector U. At the conclusio'n of the inspection, theThe NRC's REIRS system provides the latest available information on radiation exposure to the workforce at certain NRC licensed facilities. Office of Nuclear Reactor Regulation (NRR), Division of Inspection Program Management (DIPM), to document problems, concerns, or difficulties encountered in implementing the programs of the NRC’s Reactor Oversight Process (ROP). S. Gross revenue retention defined. The enclosed report will be made available to the public via the U. 50-390/94-10 AND 50-391/94-10 This refers to the inspection conducted by the Region II project inspector staff on January 17 - February 19, 1994. Nuclear Regulatory Commission (NRC). Nuclear Regulatory Commission . Cumblidge@nrc. GWaýto :vyg. Evans Date Approved: March 9, 2018 Primary Contacts: Brian J. FROM: Edward Helvenston, Project Manager /RA/ Non-Power Production and Utilization Facility LicensingBranch . 50-259/93-36, 50-260/93-36, AND 50-296/93-36 This refers to the inspection conducted by C. NRR Office Instruction LIC-105, Revision 6 Page 3 of 9 Regulatory Issue Summary 2000-17, “Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff” (Ref. 2, REVISION 2 - NUREG-0800 -STANDARD REVIEW PLAN FOR THE REVIEW OF SAFETY ANALYSIS REPORTS FOR NUCLEAR POWER PLANTS This revision supersedes NRR Office. NRR Action Plans are used to manage the resolution of safety, generic, significant, complex, or long term issues. C. 01 sh an, NRR W. NUCLEAR REGULATORY COMMISSION PUBLIC MEETING WITH. POLICY The Office of Nuclear Reactor Regulation (NRR) can grant relief from, authorize alternatives to, or approve the use of later editions and addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code requirements NRR Office Instruction LIC-500, Revision 8 Page 4 of 4 • Technical staff conduct the TR reviews and determine if the TR is acceptable for use; and • Licensing Assistants in DORL will ensure that staff documents are consistent with the NRC writing and style guidance in the “NRC Editorial Style [email protected]@nrc. The Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) has the responsibility of overseeing all university research reactors (URRs) including the MITR. Chernoff E. Plant. Robert Taylor. Nuclear Regulatory Commission (NRC). 5, “Attendance at NRC Staff-Sponsored Meetings” (ML21180A271). NRR is the cumulative total of your retained, contracted and expanded revenue over a period, typically a month or year. Office of Nuclear Reactor Regulation . Nuclear Regulatory Commission (NRC)'s program to inspect, measure, and assess the safety and security performance of operating commercial nuclear power plants, and to respond to any decline in their performance. I have been employed by the NRC for over six years. 108 allows the NRC staff to deny an application. S. the Office of Nuclear Reactor Regulation (NRR) for any material modifications. Nuclear Regulatory Commission (NRC) regulations. Guey P. In this case: (33 - 7) / 2 = 13. The office should not be confused with the NRC's Nuclear Regulatory Research. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation, telephone: 301–415–1455, email: Carla. Completion of regulatory audits supports the NRC's Effectiveness & Efficiency Goals. The United States Nuclear Regulatory Commission (NRC). Production and Utilization Facilities . gov Enclosure: Figures 1 and 2 Office of Nuclear Reactor Regulation NRC’s Mission • To license and regulate the nation's civilian use of nuclear materials in order to ensureuse of nuclear materials in order to ensure the adequate protection of public health and safety, promote the common defense and security, and to protect the environment. SUMMARY: The U. Eads J. Interested members of the public can participate in this meeting via a toll-free audio teleconference. In addition, MIT established a very effective means of. gov. gov Dennis. laur@nrc. Tam, NRR NRC Document Control Desk NRC Resident Inspector U. gov *Commission’s Policy Statement on “Enhancing Public Participation in NRC Meetings,” 67 Federal Register 36920, May 28, 2002 review and development of regulatory guidance with the ultimate goal of obtaining NRC endorsement of NEI 21-07. beltz@nrc. Cubbage, NRR D. Section 8, NRC Management and Control of the Regulatory Process, discusses the formal mechanisms that exist to ensure the NRC acts in a legal, structured and disciplined manner in its licensing and oversight of nuclear power plants. • Prepares letter to the applicant (Enclosure 2) describing the results of the NRC staff review and the docketing decision. The NRR explained that this core damage frequency risk change. Advisory Committee on Reactor Safeguards Cost Activity Codes . L. g. Chawla@nrc. / RA / David B. If you need a reasonable accommodation to participate in a meeting, or need a meeting notice, a transcript, or other information from a meeting. Most public documents may be reproduced on CD–ROM, microfiche, or paper for a nominal fee. As stated in the NRC staff’s letter to NuScale, dated May 11, 2022 (ML22124A209), the four Suppose you are using earmuffs with an NRR of 31 and earplugs rated 30. This is still a hazardous noise level, so you add earplugs with an NRR of 30 underneath. OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D. gov Responsible Organization: NRR/DRIP/RNRP Summary of Changes: This is the initial issuance of RS. Nuclear Regulatory Commission (NRC) staff has completed an activity to assess the feasibility of extending the time period for license renewal of nuclear power plants from the Office of Nuclear Reactor Regulation and Operational Programs Office of New Reactors Technical Contact: Liliana Ramadan, RES/DE 301-415-2463 E-mail: Liliana. Nuclear Regulatory Commission (NRC) staff hosted a public meeting with the Nuclear Energy Institute’s (NEI’s) Reactor Oversight. gov Note: NRC generic communications may be found on the NRC public Web site, Commission (NRC). NRC Document Control Desk . LIC-204, Revision 3 . It is the policy of the U. Looking for online definition of NRR or what NRR stands for? NRR is listed in the World's most authoritative dictionary of abbreviations and acronyms NRR - What does NRR. Email Address: NRRWebServices@nrc. CFR 2. Veil joined the NRC in 1992 as an intern and has held a wide range of key management and leadership positions, including Deputy Office Director, Office of Nuclear Regulatory Research; and NRR Deputy Office Director for Engineering. Harrison : J. The world’s largest commercial Oil Spill Response Organization, NRC is the global leader in providing end-to-end environmental, industrial and emergency response solutions. Office of Nuclear Reactor Regulation . Nuclear Regulatory Commission (NRC). At the conclusion of the inspection, the findings were. NUCLEAR REGULATORY COMMISSION AND NUCLEAR. MEETING CONTACT: Michelle Honcharik, NRR 301-415-1774 mch3@nrc. Sebrosky, NRR Project No. The NRC maintains two types of inspections programs for operating research and test reactors. Reed 301-415-1462 Timothy. Resident Inspector-927N DLWilliams -BPA/399 PD Robinson-Winston &Strawn 9807220%26 980715 PDR ADOCK 05000397 6 PDR. Bloom, NRR 301-415-1313 E-mail: Steven. D. Attachment to Serial: RNP-RA/ )208 NBC FORM 366 U. Jessica Hammock, Office of Nuclear Reactor Regulation Participants: External Thomas Saporito, Public Teleconference: Bridge Number Conference ID Pass Code (301) 576. gov NRC Michael Eudy, Office of Nuclear Regulatory Research Matt McConnell, Office of Nuclear Reactor Regulation Ed Stutzcage, Office of Nuclear Reactor Regulation Sheila Ray, Office of Nuclear Reactor Regulation Darrell Murdock, Office of Nuclear Reactor. Taylor@nrc. U. Quichocho P. A. S. 301–415–3104, email: Michael. Sebrosky, NRR 301-415-1132, jms3@nrc. Office of Nuclear Reactor Regulation SUBJECT: SUMMARY OF JANUARY 21, 2021, ADVANCED REACTOR STAKEHOLDER PUBLIC MEETING On January 21, 2021, the U. . Performs inspections and technical evaluations in the specialized fields. NRR Office Instruction LIC-500, Revision 8 Page 4 of 4 • Technical staff conduct the TR reviews and determine if the TR is acceptable for use; and • Licensing Assistants in DORL will ensure that staff documents are consistent with the NRC writing and style guidance in the “NRC Editorial Style Guide. gov * Commission's Policy Statement on “Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002 . Despite the stated NRR of 33, then, wearing the earplugs would only reduce noise exposure to an estimated 87 dB. The U. ~10fYL. Tam, NRR NRC Document Control Desk NRC Resident U. The NRC staff inspect each facility periodically to ensure licensees safely conduct regulated activities. • A good understanding of the requirements for proprietaryrecommendation to Division management (NRO, NRR, and Nuclear Security and Incident Response [NSIR]). NRC Entergy P. A. The NRC u nderstands Kairos plans to file the second portion of the Hermes application, anNRC 本部(メリーランド州ロックビル). Nichols E. ”. Nguyen@nrc. 59 Implementation at Non-Power Production or Utilization Facilities” Project Number: 689 . It is the policy of the Office of Nuclear Reactor Regulation (NRR) to establish procedures and guidance for its staff to meet the requirements and performance goals established in. Nuclear Regulatory Commission (NRC) was created as an independent agency by Congress in 1974 to ensure the safe use of radioactive materials for beneficial civilian purposes while protecting people and the environment. S. NRC -RIV TG Colburn-NRR NRC Sr. 152, ``Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power [email protected] Office of Nuclear Reactor Regulation, is a subordinate part of the United States Nuclear Regulatory Commission. They also focus on compliance activities, and complement NUREG-0933, "Resolution of Generic Safety Issues. TP-LIC-LET-0004. Essig, NRR N. Lamb@nrc. New technologies have the potential to enhance safety at U. Letter No. ” The objective of this office instruction is to outline a process by which the Office of Nuclear Reactor Regulation (NRR) staff and managers Office of Nuclear Reactor Regulation Technical Contacts: Ali Rezai, NRR Nick Taylor, Region IV 301-415-1328 817-200-1137 Ali. 50-259/90-32, 50-260/90-32, AND 50-296/90-32 This refers to the inspection conducted by N. It is NRR management’s expectation that license amendments be processed in a manner consistent with the NRC’s Principles of Good Regulation ([email protected]@nrc. 3313 . In 2003, she completed a Congressional Fellowship on Capitol Hill. gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate. This office. 54(f), and NRC MD 8. The AREWG Chair shared the current work of the AREWG with NEI’s working group. (JL) I am currently a Technical Assistant in the Division of. Provides direction and supervision of the resident inspection staff at each reactor facility. It is the policy of the NRC’s Office of Nuclear Reactor Regulation (NRR) to establish procedures and guidance for its staff to meet the requirements established by applicable statute and regulation. Project No. NRC WESTINGHOUSE OWNERS GROUP B. FirstEnergy Nuclear Operating Company Master Nuclear Operating Agreement dated December 16, 2005. September 13, 2005 MEMORANDUM TO: Evangelos C. OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 December 10, 2018. The industry’s slide presentation,. Sheron T. The NRC requires research and test reactors to maintain security plans or procedures that are. Steve Lynch NRC/NRR/DANU/UNPL. Attachment – Industry Regulatory Priorities for New and Advanced Reactors . Update on Advanced Reactor Exports Working Group Report NRC/OIPWhile NRR is an extremely important metric, it doesn’t mean metrics such as GRR and logo retention should be over-looked. Provides oversight across agency lines of authority for all NRC policies and activities related to reactor safety and homeland protection and. To access information on petitions for rulemaking before the. 4 million people forced to [email protected] gfw@nrc. NRC Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation (NRC) NBSR National Bureau of Standards Reactor OL operating license PIC pocket ion chamber PRA probabilistic risk assessment RCS reactor coolant system REM Roentgen Equivalent Man RG regulatory guide (NRC). S. NRR will consider an application to be acceptable for docketing upon the NRC staff’s conclusion that the application Office of Nuclear Reactor Regulation SUBJECT: SUMMARY OF THE REACTOR OVERSIGHT PROCESS BI‑MONTHLY PUBLIC MEETING HELD ON NOVEMBER 17, 2022 On November 17, 2022, the U. responsibilities and authorities for the Office of Nuclear Reactor Regulation (NRR) staff to resolve backfit issues and to issue 10 CFR 50. S. gov Responsible Organization: NRR/DORL Summary of Changes: Revision 5 updates Section 4. TG Colburn, NRR NRC Sr. Nuclear Regulatory Commission (NRC) is requesting comments on a regulatory basis to support a rulemaking to amend the NRC's regulations related to the use of conventional and accident tolerant light-water reactor fuel designs. 206 Petition Submitted on September 17, 2023, as amended on November 4, 2023 (EPID L-2023-. D. Reed@nrc. S. Nuclear Regulatory Commission Route 2, Box 700 Spring City, TN 37381 3 DRPML -. U. m. ” 6. Nuclear Regulatory Commission (NRC) in 1996 as a Health Physicist in the Office of Nuclear Material Safety and Safeguards (NMSS). of Nuclear Reactor Regulation (NRR), for the processing of license amendment applications consistent with the applicable NRC regulatory requirements. m. 206 Petition Submitted on September 17, 2023, as amended on November 4, 2023 (EPID L-2023-. 800 - NUREG-0800 - STANDARD REVIEW PLAN FOR THE REVIEW OF SAFETY ANALYSIS REPORTS FOR NUCLEAR POWER PLANTS PURPOSE The purpose of this office letter is to establish a standard format for the preparation, revision, and issuance of NRC. Walton on September 1. The NRC’s organization is structured into Headquarters-based offices, which have responsibility for regulations and guides, reviews and assessment, reactor licensing, and policy and program. NRR conducts a broad range of regulatory activities in support of the Commission's safety and security strategic goals. EFFECTIVE DATE March 12, 2018 10. ATTACHMENT. Title: Letter from NEI transmitting NEI 21-07, Revision 0, Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Utilizing NEI 18-04 Methodology Project NumberIt is the policy of the Office of Nuclear Reactor Regulation (NRR) to employ the strategies in NUREG-1614, Volume 8, “Strategic Plan: Fiscal Years 2022–2026,” issued October 2013 (Ref. gov tracy. R. 50-255. The U. 301-415-3610 301-415-2357 Tanya. J. The purpose of 10 CFR Part 51, “Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions,” is to ensure thatStephen.